• EXEDY OEM Clutch Kit

    rn

    EXEDY OEM Clutch Kit

    rn

    rn

    EXEDY OEM Clutch Kit

    rn

    rn

    EXEDY OEM Clutch Cover

    rn

    All cover assemblies endure a precise robotic testing process to ensure proper clamp load and clutch lift separation. This step ensures optimal pedal feel for better drivability. To help guarantee durability, the diaphragm spring (dark fingers in the center) receives special high frequency induction heat treating. This helps prevent the wear that normally occurs at the contact surface of the release bearing. Together, these procedures provide you a like-new pedal feel throughout the life of your clutch.

    rn

    rn

    rn

    EXEDY OEM Clutch Disc

    rn

    EXEDY Engineers develop, perfect and manufacture our own friction materials. We produce a material with exceptional friction and wear characteristics that will help engage smoothly, grip as expected and provide you with a longer lasting installation. Disc Spring Dampers: This is the center section of the clutch disc. EXEDY spring-type disc dampers are patented worldwide to suppress engine and driveline noise by absorbing vibrations .Vehicle-specific designs let you enjoy your ride without compromise.

    rn

    rn

    rn

    EXEDY OEM Release Bearing

    rn

    EXEDY OEM Release Bearing

    rn

    rn

  • Radiator

    rnrnrn

    1 Row Plastic Tank Aluminum Core

    rnRadiatorrnrnCSF factories are ISO/TSO certified;CSF Radiators are designed and built to High Performance Standards & sold worldwide for over 50 years – over 30 Million Units Sold!;Our Radiators are carefully engineered & Wind Tunnel Tested in labratory for Cooling Performance Validation;We have over 10,000 different models of Radiators that we manufacture & supply for all the leading brands of vehicles on the roadrn

      • rn

      • OEM specified Plastic Tank-Aluminum Core Construction

    rn

      • Tanks are made from Virgin Grade Engineered plastic resins, which are “Glass Filled” for added Strength & Durability

    rn

      • Gaskets are made from Special Grade “EPDM” rubber to withstand extreme temperatures of up to -120 Degrees F

    rn

      • Tubes – Welded Type or Latest Generation “B-Tube” Design

    rn

      • Fins (Heart of Radiator) – High Performance “Multi-Louvered Design” – OEM Spec

    rn

      • 100% leak tested before leaving factory at 150% of operating pressure

    rn

      • Industry Best Packaging – “10 Foot Drop Test” Standard

    rn

      • Drop-in Fit

    rn

      • High Performance Transmission Cooler with special Built-in Turburlator, when applicable

    rn

      • All components are installed, torqued, & tested on Radiator during assembly

    rn

  • MOTOR MOUNT

    rnrnMarmon Ride Control (formerly DEA Products) has been a trusted manufacturer of engine and transmission mounts for over 30 years. Marmon Ride Control uses the highest quality of raw materials available, and thoroughly tests their products with state-of-the-art lab equipment to ensure that you’ll be installing a mount that will meet or exceed your original mount’s specifications.rnrnTesting Includes:rnVisual InspectionrnVisual / FinishrnPaint / Rubber AppearancernWeld IntegrityrnDimensional VerificationrnDimensions tested / approved using CMM (machine which takes readings in six degrees of freedom and displays these readings in mathematical form)rnElastomer / Durometer TestedrnRubber Hardness CheckrnEvery shipment inspected thoroughlyrnSupplier verification on siternRubber Tensile Strength testedrnStrip sample and test of rubber processingrnSupplier must submit test report and sample from every batchrnOn-site audits to verify process capabilitiesrnThermogravimetric AnalysisrnTGA / Rubber Compression Tests (changes in physical and chemical properties of mount materials are measured as a function of increasing temperature (with constant heating rate), or as a function of time (with constant temperature and/or constant mass loss))rnRheometer / Vulkameter tested (measure the way rubbers respond to applied forces)rnSupplier must submit test report and sample from every batchrnOn-site audits to verify process capabilities

Main Menu